City of Monroeville Inspection Requirements

Construction or work for which a building permit is required shall be subject to inspection by the building official. Such construction and work shall remain accessible and exposed for inspection purposes until approved. It shall be the duty of the of the permit applicant to cause the work to remain accessible and exposed for inspection purposes. Neither the building official nor the City of Monroeville shall be liable for expense entailed in the removal or replacement of any material required to allow inspection. The building official, upon notification, shall make the applicable inspections checked below. Please phone the Building Inspector at one of the following numbers to schedule an inspection: (inspections should be scheduled at least one business day in advance of the time needed).

Inspections with a check are required:

All such construction and work shall remain accessible and exposed for inspection purposes until approved. It shall be the duty of the of the permit applicant to cause the work to remain accessible and exposed for inspection purposes. Neither the building inspector nor the City of Monroeville shall be liable for expense entailed in the removal or replacement of any material required to allow inspection. The building inspector, upon notification, will make the applicable inspections listed below. Please phone the building Inspector at 575-2081 or 238-2048 to schedule an inspection. Inspections should be scheduled at least a half a business day in advance of the time needed.

Notes:
All subcontractors on the job must show current city business license.
A copy of the building permit must be prominently displayed on the property.
A copy of the construction drawings, approved by the Building Official, must be kept on site and shall be available to inspection by the building inspector.